top of page
RIVER LATROBE HYDRO-ELECTRIC SCHEME
Read by Jocelyn Bloye 2019
00.00 Intro
00.22 Formation of the consortium & costs
01.04 Construction & setbacks
04.30 SEC supply from Yallourn
05.00 Power to Noojee & Neerim & end of the scheme
05.20 Bill’s speech 1971
07.10 Second hand electrical plant & other problems
10.44 Company lay blame. Accusations.
11.23 Power in Warragul
12.00 end
Bill Bloye with other workers at Moe River
bottom of page